w-trans.com - W-Trans | California Traffic Engineering Consultants

Example domain paragraphs

ROUNDABOUT PLANNING AND DESIGN W-Trans assisted with the design plans and specifications for a roundabout at the junction of two arterials in Agua Caliente, located at the transition between rural and suburban Sonoma County.

The City of Chico created a bicycle corridor in the First and Second Street corridors serving the Chico State University and core downtown area. New bike lanes and improved traffic flow were achieved within the existing road width through a “road diet” and conversion to a one-way street couplet.

Old Redwood Highway/US 101 North-Lakewood Drive Intersection Improvements Project (Town of Windsor). The signalized intersection at the northbound off-ramp provides primary access to the Town of Windsor at the Downtown interchange.