iwapi.net - Mobile Barriers MBT-1® | Traffic Barrier System | Road Barrier | Positive Protection for Work Zones

Description: Mobile Barriers MBT-1® is a traffic barrier system which can be outfitted to provide complete traffic control & work zone logistics. Mobile Barriers MBT-1® provides 42-102 feet (12-31 meters) of positive protection with minimal deflection. Mobile Barriers MBT-1® is a traffic barrier system for short-duration and short-term work zones, road construction & maintenance, emergency bridge repair, moving operations, and emergency response. The mobility of the MBT-1® allows rapid work zone setup/removal and enable

barriers (160) road barrier (21) work zone (13) barrier system (12) barrier systems (10) mbt-1 (7) mobile barriers (6) positive protection (5) congestion mitigation (5) work zone protection (5)

Example domain paragraphs

The Mobile Barriers MBT-1® was originally developed after a tragic accident in which two Colorado road maintenance workers were killed by a wrong-way driver. It underwent years of development and refinement working with the Colorado Department of Transportation (CDOT) and the Federal Highway Administration (FHWA) before being first deployed in June 2008.

After further evaluation, it was formally introduced the following year where it was awarded the American Traffic Safety Services Association’s (ATSSA’s) Innovation of the Year Award. It has since gone on to receive increasing accolades for improving safety, efficiency, and traffic flows in and around work zones, including additional national and international awards from the American Road & Transportation Builders Association (ARTBA), Transportation Development Foundation (TDF), Better Roads, Transportatio

Mobile Barriers MBT-1® is a revolutionary traffic barrier system that can be quickly deployed to provide superior protection for teams working in live traffic. The MBT-1® has been called the "perfect tool" for various types of road, bridge, and tunnel work. The mobility of the MBT-1® allows rapid work zone setup/removal and enables managers to reduce project duration, schedule around peak traffic hours, and minimize roadway congestion. Equipment and supplies integrated into the MBT-1® allow project managers